I was told that a new meter is being worked upon and will eventually replace those already installed. Smart Energy GB, the body responsible for the rollout, has confirmed that this is very real, and smart meters installed in the area will not have had their smart capacity turned on. I have been involved with the construction of hundreds of new homes in Teesside, all of which have had smart meters installed. But after being given a date, I was later declined on the basis that smart meters cannot work at my address because they interfere with the missile early warning system at RAF Fylingdales. I applied to have the required smart meter installed. A few months ago I decided to switch energy supplier and moved to Octopus Energy’s Go tariff, principally because it offers cheap electric car charging overnight at a rate of 5p/kWh.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |